Installation process of battery connected aluminum busbar
Nov 22, 2024
▲Prepare tools and materials:
Aluminum busbar, bolts, nuts and washers, wrenches and screwdrivers, insulated gloves, cleaning tools (such as cloth and cleaning agents)
▲Safety measures:
Ensure that the power is disconnected during installation to avoid the risk of electric shock. Wear insulated gloves to ensure safety.
▲Clean the contact surface:
Use cleaning tools to clean the contact surface between the aluminum busbar and battery terminals, ensuring that there are no oxides, dust, or oil stains to improve conductivity.
▲Measurement and cutting:
Measure the aluminum busbar according to the required length and cut it to the desired length using appropriate tools.
▲Install aluminum busbar:
Align the aluminum busbar with the connection terminals of the battery to ensure its correct position.
Secure the aluminum busbar to the battery terminals using bolts, nuts, and washers. Make sure the connection is secure, but do not overtighten to avoid damaging the battery terminals.
▲Check connection:
Ensure that all connections are secure and not loose. Check for good contact between the aluminum busbar and battery terminals.
▲Insulation treatment:
If necessary, use insulation tape or heat shrink tubing to insulate the connection to prevent short circuits and improve safety.
▲Testing:
Reconnect the power supply and test the connection between the battery and aluminum busbar to ensure smooth current flow.
▲Organize tools and materials:
Clean up the work area, gather tools and excess materials to ensure safety.







